Electrostatic powder coating line for car pad
1. Coating : automatic powder coating
2. Drying tunnel heating: electric heating
3. Hanging distance: 600 mm one at a time distance
Automatic Electrostatic Powder Coating Line For Car Brake Pads OEM
I.Design basis(user supply)
1. product name: brake pads
2. material: Iron-pieces
3. product max size: L150×W150×H30(mm)
4. product max weight: ≤30Kg
5. Conveyor chain single hanging weight: 0.35Kg model:QXG(200)
6. Hanging: one hangers one piece product
7. Hanging distance: 600 mm one at a time distance, hang from actual set according to different workpiece
8. Design line speed and adjustable line speed: 1.5m/min
9.coating area: surface
10. coating : automatic powder coating
11. Drying tunnel heating: electric heating
12. Compressed air: the users themselves, freeze-drying, moisture content <1.3g/m3 oil content <1PPM
13. Plant area: see Figure
14. Energy: (1) three-phase five-wire (380V). With a ground wire (2) Compressed air
1. product name: brake pads
2. material: Iron-pieces
3. product max size: L150×W150×H30(mm)
4. product max weight: ≤30Kg
5. Conveyor chain single hanging weight: 0.35Kg model:QXG(200)
6. Hanging: one hangers one piece product
7. Hanging distance: 600 mm one at a time distance, hang from actual set according to different workpiece
8. Design line speed and adjustable line speed: 1.5m/min
9.coating area: surface
10. coating : automatic powder coating
11. Drying tunnel heating: electric heating
12. Compressed air: the users themselves, freeze-drying, moisture content <1.3g/m3 oil content <1PPM
13. Plant area: see Figure
14. Energy: (1) three-phase five-wire (380V). With a ground wire (2) Compressed air
II,Pipeline process (V=1.5m/min)
Surface pretreatment and put on the line into spray booth
curing oven take out( cool) offload
Remark:Send Good spraying workpieces into the oven and shut down the conveying
chain, then close the oven door, open the oven heating, set 180 ℃, holding time for 20
minutes, keep warm until the oven automatically cut off power supply, open the oven
door and conveyor chain, after workpiece out spray painting another product.
Surface pretreatment and put on the line into spray booth
curing oven take out( cool) offload
Remark:Send Good spraying workpieces into the oven and shut down the conveying
chain, then close the oven door, open the oven heating, set 180 ℃, holding time for 20
minutes, keep warm until the oven automatically cut off power supply, open the oven
door and conveyor chain, after workpiece out spray painting another product.